Starting Date (estimated): 2025-07
Location: RICHMOND (BC)
Size:
$122,000.00
Stage: 6-Waiting to start
Published: 2025-07-14
Last Update: 2025-07-14
Work type: Renovation / Alterations / Modernization
Sector: Private
Category:
2-Commercial
Subcategorie:
2D-Warehouses & Distribution Centres
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Other
WAREHOUSE RENOVATION
*** Construction Permit ***
Located in Richmond, 115 - 11920 Forge Place, this project estimated at $122 000 is ready to start (or underway - unverified). Works concern warehouse tenant renovations.
Construction Manager: INFORMATION AVAILABLE TO SUBSCRIBERS
Contractor: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-07
Location: TORONTO (ON)
Size:
N/A
Stage: 2-Planning
Published: 2025-07-14
Last Update: 2025-07-14
Work type: New construction
Sector: Private
Category:
1-Industrial
Subcategorie:
1D-Wood, Glass, Construction Products & Furnitures
Disciplines: Architecture, Electricity, Equipment, HVAC, Instrumentation, Building mechanic, Structural, Other
NEW STARTUP MODULAR HOME BUILDER MANUFACTURING FACILITY
Located in Toronto, this project (Stelumar Advanced Manufacturing Inc. (SAMI)) is in the preliminary stage. The Initiator is currently seeking a site. Works concern the construction of a manufacturing facility.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): N/A
Location: KINGSTON (ON)
Size:
$25,000,000.00
Stage: 3-Planning or drawing
Published: 2025-07-14
Last Update: 2025-07-14
Work type: New construction
Sector: Private
Category:
1-Industrial
Subcategorie:
1S-Recycling & Environment
Disciplines: Architecture, Electricity, Environment, Equipment, HVAC, Instrumentation, Building mechanic, Structural, Other
NEW WASTE RECYCLING COMPANY PROCESSING FACILITY
Located in Kingston, this project (Cyclic Materials Inc.) estimated at $25 000 000 is in the Planning/Design stage. The Initiator is currently seeking approval for the project. Completion is slated for January 2026. Based on a surface of 140 000 sqft, works concern the construction of a processing facility.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-01
Location: QUÉBEC (QC)
Size:
$23,460,000.00
Stage: 2-Planning
Published: 2025-07-11
Last Update: 2025-07-11
Work type: New construction
Sector: Private
Category:
1-Industrial
Subcategorie:
1F-Industrial & Commercial Equipment
Disciplines: Architecture, Electricity, HVAC, Instrumentation, Building mechanic, Industrial mechanic, Structural, Other
CONSTRUCTION D'UNE USINE DE PIÈCES & DE COMPOSANTS REMANUFACTURÉS
Situé à Québec, ce projet (Toromont Industries Ltd), évalué à 23 460 000 $, est préliminaire (définition de la portée du projet). Il devrait débuter en janvier 2026 pour se terminer en janvier 2027. Les appels d'offres sont prévus entre novembre 2025 et janvier 2026. Répartis sur 63 879 pc, les travaux visent la construction d'une nouvelle installation pour la fabrication de pièces et de composants remanufacturés. Le projet, qui inclut l'installation d'équipements auxiliaires et de systèmes de soutien, a pour but d'accroître la capacité opérationnelle en matière de fabrication circulaire.
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): N/A
Location: QUÉBEC (QC)
Size:
$19,140,000.00
Stage: 3-Planning or drawing
Published: 2025-07-10
Last Update: 2025-07-10
Work type: New construction
Sector: Private
Category:
4-Residential
Subcategorie:
4C-Multi Housing
Disciplines: Architecture, Electricity, HVAC, Building mechanic, Structural, Other
CONSTRUCTION D'UN IMMEUBLE DE LOGEMENTS
Situé à Québec, 3155 chemin des Quatre-Bourgeois, ce projet, évalué à 19 140 000 $, est en planification. Une participation citoyenne est planifiée et la suite du projet est conditionnelle à l'obtention des approbations. Les travaux visent la construction d'un immeuble d'habitation comprenant environ 400 logements.
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2025-07
Location: VICTORIAVILLE (QC)
Size:
N/A
Stage: 5-Bidding
Published: 2025-07-09
Last Update: 2025-07-09
Work type: Renovation / Alterations / Modernization
Sector: Public
Category:
1-Industrial
Subcategorie:
1B-Water Treatment
Disciplines: Not determined
RÉNOVATION D'UNE USINE D'ÉPURATION DES EAUX
Référence BSDQ # V-0036-25
Référence Ville de Victoriaville # B2023-04-115350
Situé à Victoriaville, 555 boul. Jutras O., ce projet (Usine d'Épuration Achille-Gagnon) est en appel d'offres jusqu'au 15 août 2025 au BSDQ. Les travaux visent les ouvrages de décarbonation d'une usine d'épuration des eaux.
Starting Date (estimated): 2026-07
Location: CALGARY (AB)
Size:
$17,880,000.00
Stage: 2-Planning
Published: 2025-07-08
Last Update: 2025-07-08
Work type: New construction
Sector: Public
Category:
5-Civil
Subcategorie:
5K-Public Transport
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
NEW AIRPORT TRANSPORTATION FACILITY
Located in Calgary, this project estimated at $17 880 000 is slated to begin in July 2026. It is in the initial stage. Based on a surface of 120 379 sqft, works concern the new construction of a multi-use facility at an airport.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2025-12
Location: ESSEX (ON)
Size:
$74,800,000.00
Stage: 4-Drawing
Published: 2025-07-08
Last Update: 2025-07-08
Work type: Expansion / Addition
Sector: Private
Category:
1-Industrial
Subcategorie:
1P-Power Production
Disciplines: Architecture, Civil, Electricity, Environment, Equipment, HVAC, Instrumentation, Building mechanic, Industrial mechanic, Structural, Other
BATTERY ENERGY STORAGE SYSTEM (BESS) EXPANSION
Located in Essex, this project (East Windsor Battery Energy Storage System) estimated at $74 800 000 is in the drawings stage. It is slated to begin in December 2025 and be completed in June 2026. Tender is anticipated to be issued in February 2026. Works concern the expansion of a 40 MW battery energy storage unit to an existing site. The project involves the erection of a new facility employing lithium-ion batteries or an equivalent technology, along with all related infrastructure. Such systems are critical for modern power grids as they enhance stability and store energy generated from intermittent sources like wind and solar.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Consultant: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): N/A
Location: ABBOTSFORD (BC)
Size:
$6,793,000.00
Stage: 3-Planning or drawing
Published: 2025-07-07
Last Update: 2025-07-07
Work type: New construction
Sector: Private
Category:
2-Commercial
Subcategorie:
2D-Warehouses & Distribution Centres
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
NEW SELF-STORAGE FACILITY
Located in Abbotsford, 33675 Morey Ave., this project estimated at $6 793 000 is in the planning stage. Works concern the construction of a warehouse building designed to provide self-storage space.
Architect: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): N/A
Location: CALGARY (AB)
Size:
$43,790,000.00
Stage: 4-Drawing
Published: 2025-07-07
Last Update: 2025-07-07
Work type: New construction
Sector: Private
Category:
1-Industrial
Subcategorie:
1Q-Chemicals & Oil Products
Disciplines: Architecture, Civil, Electricity, Environment, Equipment, HVAC, Instrumentation, Building mechanic, Industrial process, Structural, Other
NEW GAS PROCESSING PLANT
Located in Sinclair, this project (Sinclair Dry Gas Processing Facility) estimated at $43 790 000 (and over) is in the drawings stage. It is slated to be completed in October 2027. Works concern the construction of a treatment plant designed to process dry gas.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Stemming from various sources, the information received from CCD is both verified and considered true and correct for publication. In spite of these precautions, errors of human interpretation are regrettably possible and inevitable. In such cases, CCD will only assume responsibility for the necessary corrections, upon receipt of written notice concerning the errors in question. Note that sources will not be revealed, as some information received by CCD is confidential.
Below is the list of the most popular projects viewed over the last month (prorated by province):