Wednesday, March 10, 2010 |
||||
| Top 50 | ||||
|
Notice : The projects featured in this section are different and do
not reflect those featured in the paid subscription part of our site. Our database is copiously filled with
commercial and industrial projects, but in-depth research was not involved in the
preparation of this section. Therefore,
names, contact information and details are not available. All projects are presented in their original
linguistic version (English), except for projects in Quebec which are usually
written in French. Recent NewsAB
- CALGARY NEW SCHOOL: Located in Calgary, this project (Our Lady of
Fatima School) estimated at $5 000 000 is at the planning stage. The plan calls
for the construction of a new school to replace the existing Our Lady of Fatima
School. - Information: Government of
Alberta - Ministry of Infrastructure AB
- LEDUC NEW OFFICE / WAREHOUSE BUILDING:
Located
in Leduc, this project estimated at $12 000 000 is at the planning stage. The
plan calls for the construction of a new office / warehouse building. - Initiator: SHIVAM DEVELOPMENTS AB
- LETHBRIDGE BANK INTERIOR FIT-OUT: Located in Lethbridge, this project (Royal Bank of
Canada) estimated at $92 000 has bids in and under review. Works concern
interior fit-out of a bank. - Architect:
The Cohos Evamy Partners BC
- KAMLOOPS NEW RESIDENTIAL DEVELOPMENT:
Located
in Kamloops, on the South Shore, this project (Mission Hill) is underway. The
plan calls for the construction of a new residential development. - Initiator: MIKE RINK NB
- PETITCODIAC RIVER RESTORATION: Located in Petitcodiac, this project (Petitcodiac
River) is estimated at $68 000 000. The three-phase project will receive $20
000 000 in funding from the provincial government. Tender is expected in Summer
2008 and construction is slated to begin in early Fall 2008. Phase 1 will
include planning, erosion protection and remediation work; Phase 2 will consist
of restoring the river’s flow; and Phase 3 will see the construction of a 280-m
bridge. NB
- SAINT JOHN NEW TOWNHOUSE COMPLEX: Located in Saint John, at 7 Pokiok Rd., this
project received rezoning approval. The plans call for the construction of a
new 3-storey townhouse complex comprising six units. - Initiator: MATRIX MANAGEMENT INC. NS
- HALIFAX NEW TOWER BUILDING: Located in Halifax, at the corner of South Park
& Brenton streets, this project was approved by regional council in June
2008. The plan calls for the construction of a new 19-storey building. NS
- SHELBURNE NEW MULTI-PURPOSE RECREATIONAL FACILITY:
Located
in Shelburne County, this project is at the feasibility stage. A needs
assessment study, estimated at $50 000, will probably be conducted in Fall
2008. The plan calls for the construction of a new multi-purpose recreational
facility that will include an indoor pool. The renovation of existing
facilities is also being considered. -
Initiator: SHELBURNE COUNTY RECREATION SOCIETY ON
- GEORGETOWN MEDICAL CENTRE EXPANSION: Located in Georgetown, on Princess Anne Dr.
adjacent to the hospital, this project (Georgetown Medical Centre) is slated to
begin in early 2009. Site plan approval is required. The two-phase plan calls
for the expansion of a medical centre by 18 000 sqft. The first phase would see
the addition of a 10 000-sqft third floor on the existing footprint of the
building. The second phase would involve the expansion of the first and second
floor by 4 000 sqft. - Initiator:
NORTH HALTON HOLDINGS INC. ON
- HALTON HILLS NEW MIXED-USE DEVELOPMENT: Located in Halton Hills, between 10 and Five
Sideroads from Ninth Line to Trafalgar Rd., this project is at the planning
stage. A public consultation process is slated to begin in September 2008. The
plan calls for the construction of a new mixed-use development on 2 000
acres. - Initiator: GEORGETOWN COMMONS ON
- NORTH YORK NEW CONDOMINIUM BUILDING: Located in North York, at Avondale Ave. and Bales Ave., southeast of Sheppard Ave. and Yonge St., this project is at the planning stage. The
plan calls for the construction of an 11-storey, 65-unit condominium
building. - Initiator: BBT DEVELOPMENT ON
- PARRY SOUND NEW CONDOMINIUM BUILDING: Located in Parry Sound, on the west side of Tower
Hill, just off of Great North Rd., this project is slated to begin in late
2008. Rezoning is required. The plan calls for the construction of a new
5-storey, 81-unit condominium building with indoor parking. The units will
range from 1 000 to 1 500 sqft. -
Initiator: JIM STURINO PE
- CHARLOTTETOWN AQUATIC COMPLEX UPGRADES: Located in Charlottetown, on the University of
Prince Edward Island campus, this project (CARI centre) estimated at $299 400
is currently underway. It was funded through the Municipal Rural Infrastructure
Fund (MRIF) . Works include the installation of
pushbutton Daktronics, touch pads, lane dividers/covers, darken windows to
reduce light reflection, a 3-m diving board, pool lighting, and a surface
agitation system. QC
- GATINEAU RÉAMÉNAGEMENT D'UN CENTRE COMMERCIAL:
Situé
à Gatineau, à l'emplacement de l'Initiateur, ce projet est déjà en cours. Un
magasin de la bannière S3, gérée par le groupe Forzani, également propriétaire
de la chaîne Sports Experts, a ouvert le 13 août dans un local de plus de 5000
pc. Quelques magasins seront aussi rénovés, si ce n'est déjà fait, tels Le
Pacha, Bijouterie Doucet, Petrocelle et Cité. D'autres, comme Snacks et
Bo-Ka-Do, ont été relocalisés. Dynamite doublera sa superficie en déménageant
dans un nouveau local dès la fin du mois d'août 2008. Extension et Style, ainsi
qu'Ongles Modernes, ont agrandi leur surface de vente. Plusieurs magasins ont
approché la direction des Promenades de l'Outaouais pour s'établir dans le
grand local de 36 000 pc laissé vacant par Métro. Pour l'instant, rien n'est
conclu ni signé, mais un nouveau commerce pourrait s'y établir en 2009. - Initiateur: LES PROMENADES DE L'OUTAOUAIS QC
- GRANBY CONSTRUCTION D'UNE USINE DE TRI-COMPOSTAGE:
Situé
à Granby, dans le parc industriel, ce projet évalué entre 35 000 000 $ et 42
000 000 $ est en attente du rapport final de la Corporation de la gestion
résiduelle de la Haute-Yamaska (COGEMRHY) (attente du rapport final).
Différents lots de demandes de soumissions pourraient être lancés à partir de
l'automne 2008. Les travaux pourraient commencer au printemps ou à l'automne
2009. La fin des travaux est prévue pour la fin 2010. Le projet permettra le
traitement des matières résiduelles de la MRC de la Haute-Yamaska, qui produira
du compost qualité AA et A, ainsi que le traitement des 23 000 tonnes des boues
usées provenant de l'usine d'épuration des eaux de la ville de Granby. - Promoteur/Ingénieur: BPR TERREAU QC
- MONTRÉAL RENOUVELLEMENT DE L'AIRE D'EXPOSITION D'UN INSECTARIUM: Situé à Montréal, ce projet a été approuvé à la
rencontre du comité exécutif du 6 août 2008. On vise la réalisation des plans
et devis, ainsi que la surveillance des travaux du projet de renouvellement de
l'aire d'exposition de l'Insectarium de Montréal. Ce projet a pour objectif de
revoir l'aménagement de certains espaces et d'actualiser partiellement le
concept muséologique et muséographique du musée. Un contrat au montant de 344
698 $, a été octroyé à "Lupien & Matteau Inc." - Initiateur: VILLE DE MONTRÉAL QC
- MONTRÉAL RESTAURATION D'UN TERRAIN CONTAMINÉ:
Situé
à Montréal, ce projet est en attente d'autorisations au ministère de
l'environnement. Les travaux visent la restauration d'un terrain contaminé. (pour votre information seulement). Note: Nous tenons à vous
informer de cette demande faite au ministère, mais nous n'avons pas vérifié ce
projet auprès de l'initiateur. -
Initiateur: MICHEL CHÉTRIT QC
- MURDOCHVILLE EXPLOITATION D'UN SITE PÉTROLIER:
Situé
à 10 km de Murdochville, ce projet est évalué à 20 000 000 $ sur 5 ans. Une
société pétrolière qui souhaite taire son identité, s'associe à Pétrolia. On
vise à produire 5% du pétrole est consommé au Québec d'ici 5 ans. Des levées
sismiques en 3 dimensions auront lieu en septembre 2008. Par la suite, si les
prévisions se confirment, un puit de 3000 mètres sera foré à l'hiver ou au
printemps 2009. Notez que parallèlement, Pétrolia investira 5 000 000 $ à sa
propriété Haldimand, près de Gaspé, pour implanter un 2e puit. - Initiateur: PÉTROLIA QC
- QUÉBEC APPROBATION D'UN PLAN DE RÉHABILITATION:
Situé
à Saint-Nicolas, au 501 rue de l'Aréna, ce projet est en attente
d'autorisations au ministère de l'environnement. On vise l'approbation d'un
plan de réhabilitation - Ancienne station-service. (pour
votre information seulement). Note: Nous tenons à vous informer de cette
demande faite au ministère, mais nous n'avons pas vérifié ce projet auprès de
l'initiateur. - Initiateur: T.R.I.
IMMOBILIER, SOCIÉTÉ EN COMMANDITE QC
- SAINT-ANACLET-DE-LESSARD AMÉNAGEMENT D'UN CENTRE D'HÉBERGEMENT POUR AÎNÉS:
Situé
à St-Anaclet, ce projet de 135 unités est évalué à 4 000 000 $. On vise à
transformer l'ancienne école Pavillon l'Héritage en 27 logements de type
appartement, pour des personnes âgées autonomes. QC
- ST-PROSPER PLAN DE RÉHABILITATION: Situé à St-Prosper, au 1600 8e Rue, ce projet est
en attente d'autorisations au ministère de l'environnement. On vise un plan de
réhabilitation pour le 1600, 8e Rue, Saint-Prosper. (pour
votre information seulement). Note: Nous tenons à vous informer de cette
demande faite au ministère, mais nous n'avons pas vérifié ce projet auprès de
l'initiateur. - Initiateur: 9074-2388
QUÉBEC INC. SK
- DEBDEN NEW SENIORS PERSONAL CARE HOME:
Located
in Debden, this project estimated at $1 300 000 is underway, with completion
expected in late December 2008. The plan calls for the construction of a
20-bed, two-storey seniors personal care home.
- Initiator: DEBDEN & DISTRICT SENIORS HOME INC. SK
- MOOSE JAW NEW DEVELOPMENT: Located in Moose Jaw, on River St., in the downtown
area, this project is at the planning stage. The plan calls for new
development. SK
- MOOSE JAW NEW HOTEL / SHOPPING COMPLEX:
Located
in Moose Jaw, this project is underway. The plan calls for the redevelopment of
the zero block of River St. to make way for the construction of a new hotel /
shopping project. A refitted 1950's city bus will also be installed on the
street corner to serve as a tourism information booth. - Initiator: LITTLE CHICAGO DEVELOPMENT
COMPANY SK
- NORTH BATTLEFORD NEW DENTAL FACILITY: Located in North Battleford, this project is
underway, with completion expected in September 2008. The plan calls for the
redevelopment of a building into a dental facility. - Initiator: DR. PHUONG K. VU SK
- NORTH BATTLEFORD NEW SELF-STORAGE FACILITY: Located in North Battleford, in the Parson
Industrial Park, this project (Parsons Self Storage) is underway. The plan
calls for the construction of a new self-storage facility. - Initiator: GEOFF & KIM ARNOLD - Initiator:
WES & DONNA JAMIESON June 2008 / Juin 2008AB
- CALGARY NEW MIXED-USE DEVELOPMENT: Located in Calgary, this project (Stanley Square)
estimated at $10 000 000 is at the planning stage. The plan calls for the
construction of an office, condominium and retail development. - Initiator: CHA INC. AB
- INNISFAIL NEW COMMUNITY HALL: Located in Innisfail, at the corner of the Little
Red Deer Rd. & Range Rd. 21, this project (Oklahoma Community Centre)
received $50 000 in funding from the provincial government. Site preparation is
underway. Work is slated to reach completion in 2009. The multi-phase plan
calls for the construction of a new community hall at the site of the former
Oklahoma School, which was recently demolished. Phase One is expected to be
complete by the end of Summer 2008. -
Initiator: OKLAHOMA COMMUNITY CENTRE AB
- ROCKY VIEW NEW RESIDENTIAL DEVELOPMENT:
Located
in Rocky View M.D., along Highway 8, this project is at the planning stage. The
plan calls for the construction of a new residential development on 503
acres. - Initiator: LEGACY COMMUNITIES BC
- BRITISH COLUMBIA NEW HYDROELECTRIC POWER DEVELOPMENT :
Located
in the lower Klinaklini River, this project is currently undergoing an
environmental assessment process. Provincial approval is expected in July 2008.
Completion of the project is expected in 2016. The
scope of the work includes the construction of a 17-km long, 10-m diameter
tunnel to bring the water to the generators; the construction of a powerhouse
which will house eight Pelton turbines; the construction of a 180-km, 230 kV
transmission line to Campbell River; and roadwork. - Initiator: KLEANA POWER CORP. BC
- CHILLIWACK BARN RECONSTRUCTION: Located in Chilliwack, on Upper Prairie Rd., this
project estimated at approx. $500 000 has not been confirmed yet. Works would
involve the reconstruction of a chicken barn destroyed by fire in May 2008. BC
- COLDSTREAM NEW RESIDENTIAL DEVELOPMENT:
Located
in Coldstream District, this project is on hold pending municipal approvals,
i.e. rezoning and Official Community Plan amendment. A public hearing was held
on June 9, 2008 to discuss the applications. The plan calls for the
construction of a new 79-unit multi-family development on 7.9 acres. - Initiator: SUGOI PROPERTY MANAGEMENT INC. BC
- CUMBERLAND NEW RESIDENTIAL DEVELOPMENT:
Located
in Cumberland, this project (Coal Valley Estates – Phase 5) is at the planning
stage. Village council gave first reading to OCP and zoning amendments for a
property behind the north side of Camp Rd., running up beyond the top of
Egremont. Phase Four received second reading. The multi-phase plan calls for a
new residential development. Phase Four involves the development of 98 units in
fourplexes and 34 single-family homes. Phase 5 includes the construction of
approx. 850 units. A total of over 1 000 units are planned for Phases 4 and 5
combined. - Initiator: COAL VALLEY
ESTATES BC
- DUNCAN NEW MIXED-USE BUILDING: Located in Duncan, at Canada Ave. and Trunk Rd., this project (The Savoy Condominiums) is at
the site acquisition stage. Construction is slated to begin in Summer 2008. The
plans call for the construction of a new four-storey residential commercial
building with a parking lot. -
Initiator: SAM BAWLF BC
- LOWER NICOLA NEW SLAUGHTERHOUSE: Located in Lower Nicola, Initiator’s site, this
project (Kuiper Ranch) has been halted by TNRD representatives. The building
was deemed too close to nearby houses. The plan calls for the construction of a
new slaughterhouse. - Initiator: KUIPER
RANCH BC
- NORTH VANCOUVER NEW RESIDENTIAL UNITS: Located in North Vancouver, on 15th St., this
project is underway. The plan calls for the construction of new residential
units. - Information: CITY OF NORTH VANCOUVER BC
- POWELL RIVER NEW ASSISTED LIVING FACILITY / NEW RESIDENTIAL UNITS: Located in Westview, between Manson Ave. and Georgia Cres., in the Royal Georgia subdivision, this
project is at the planning stage. City council gave first and second reading to
bylaw amendments. A public hearing was to be held on May 27, 2008. The plan
calls for the development of a 56-unit assisted living facility and 18
residential lots on 5.5 acres. -
Initiator: WESTCOAST ENDEAVOURS LTD BC
- POWELL RIVER NEW SENIORS’ HOUSING DEVELOPMENT:
Located
in Powell River, bordering on McGuffie Creek, on the left-hand side of Joyce
Ave. just past Powell River General Hospital, this
project is at the planning stage. Information sessions were held. The plan
calls for the construction of a new seniors’ retirement housing development
including a 50-unit independent-living residence (Creekside Lodge) and 20
cottage-style homes (Creekside Village) on 7.5 acres. The independent-living
residence will include an open plan that integrates the kitchen with the dining
room and a large stone fireplace. -
Initiator: JOHN SPICK - Initiator: BILL
CRYSLER BC
- SURREY NEW CONDOMINIUM DEVELOPMENT:
Located
in East Clayton area, at 64th Ave. and 194th St., this
project (Waterstone) is at the planning stage. The plan calls for the
construction of new condominium units. 171 units are planned in Phase One. A
landscape design including pools and flowing water features is also
planned. - Initiator: WATERSTONE BC
- VERNON NEW AFFORDABLE HOUSING COMPLEX:
Located
in South Vernon, on 19th Ave., 4300-block, this project (Vernon Native Housing
Project) has been approved by city council. The plan calls for the construction
of a new 40-unit affordable housing complex.
- Information: City of Vernon MB
- LAC DU BONNET NEW TRANSITIONAL HOUSING/EMERGENCY SHELTER FACILITY: Located in Lac du Bonnet, along Hwy 11, across from
the Glenn Howard Inn, this project (The Lucci House) is awaiting rezoning
approval. A public hearing was held on April 28, 2008 to discuss the
application. The plan calls for the conversion of a former vet clinic into an
8-unit transitional housing/emergency shelter facility. - Initiator: THE LUCCI HOUSE ON
- CAMBRIDGE NEW AFFORDABLE HOUSING COMPLEX:
Located
in Cambridge, at 1021 Queenston Rd., this project estimated at $1 200 000 has
been completed. Funding was made available under the Canada-Ontario Affordable
Housing Program. The plan calls for the construction of a 42-unit affordable
housing complex. - Initiator: VICTORIA
PARK HOMES LTD ON
- CAMBRIDGE NEW AFFORDABLE HOUSING COMPLEX:
Located
in Cambridge, at 35 Water St. S., this project estimated at $2 500 000 has been
completed. Funding was made available under the Canada-Ontario Affordable
Housing Program. The plan calls for the construction of a 54-unit affordable
housing complex. - Initiator: LANCER
TIGER LOFTS CORP. ON
- MARKHAM NEW SITE DEVELOPMENT: Located in Markham, 9483 McCowan Rd., RR 1, this
project is at the draft plan and zoning stage. Works concern construction of a
new site development. -
Initiator/Promoter/Information: S C LAND MANAGEMENT CORP. ON
- NORTH BAY NEW RESORT HOTEL & CONFERENCE CENTRE:
Located
in North Bay, on Memorial Dr., former Kenroc/Uniroc site, this project has been
approved by city council. A land purchase process is underway. The plan calls
for the construction of a new 135-room resort hotel and 1 100-seat conference
centre on a 1.8-ha waterfront site. The project will involve site remediation
work. New full-time jobs will be created.
- Initiator: VRANCO ON
- NORTH YORK NEW CONDOMINIUM BUILDING: Located in North York, at Avondale Ave. and Bales Ave., southeast of Sheppard Ave. and Yonge St., this project is at the planning stage. The
Initiator filed an appeal with the OMB. City council was to vote on the
application on May 26, 2008. A hearing was to be held on June 23, 2008. The
plan calls for the construction of a 11-storey, 65-unit condominium
building. - Initiator: BBT DEVELOPMENT ON
- ORILLIA MARKET RELOCATION: Located in Orillia, this project (Orillia's
Saturday morning farmers' market) is at the planning stage. The plan calls for
the temporary relocation of a market, which currently sits on the Opera House
parking lot behind the existing Mississaga St. library, which will be
demolished. The market could be relocated on the city hall parking lot during
the construction of a new library. -
Initiator: ORILLIA’S SATURDAY MORNING FARMERS’ MARKET ON
- ORO-MEDONTE TOWNSHIP NEW DEVELOPMENT: Located in Forest Home, in Oro-Medonte Township, on
the west side of Highway 11 south of Orillia, this project is at the planning
stage. The plan calls for the construction of a new development. - Information: Oro-Medonte Township ON
- PEMBROKE NEW COLLEGE CAMPUS: Located in Pembroke, this project estimated at $32
000 000 is at the planning stage. The plan calls for the development of a new
campus. - Initiator: ALGONQUIN COLLEGE ON
- SCARBOROUGH NEW RESIDENTIAL DEVELOPMENT / MALL EXPANSION:
Located
in Scarborough, in the Warden and Finch avenues area, this project is at the
planning stage. A public consultation process is underway. The multi-phase plan
calls for the construction of 1 370 condo units in eight buildings ranging in
height from 8 to 30 stories. The expansion of the Bridlewood Mall from 320 000
sqft to 470 000 sqft is also planned. -
Initiator: MALIBU INVESTMENTS INC. ON
- SCARBOROUGH NEW RESIDENTIAL DEVELOPMENT :
Located
in Scarborough, in the Markham and Ellesmere roads area, this project is at the
planning stage. The multi-phase plan calls for the demolition of a retail plaza
to make way for the development of six buildings ranging in height from 4 to 32
storeys in a mix of condos, townhouses and seniors' residences for a total of 1
200 units. ON
- THUNDER BAY CHILD CARE CENTRE UPGRADE: Located in Thunder Bay, this project will receive
$25 000 in funding from the Northern Ontario Heritage Fund. The grant will be
used to help equip and furnish a new child care centre. - Initiator: LITTLE STEPS DAYCARE ON
- THUNDER BAY MANUFACTURING FIRM UPGRADE:
Located
in Thunder Bay, this project will receive $25 000 in funding from the Northern
Ontario Heritage Fund. The grant will be used to help equip and furnish a new
giftware manufacturing firm. -
Initiator: CREATE A WISH ON
- TORONTO NEW RESIDENTIAL DEVELOPMENT:
Located
in North Toronto, this project was rejected by city council. The Initiator
filed an appeal with the OMB, and a hearing is planned. Rezoning is required.
The plan calls for the construction of a new 25-storey apartment building on
Montgomery Ave. Residential buildings are also planned on several blocks. - Initiator: TOP OF TREE DEVELOPMENT ON
- TORONTO PARK UPGRADE: Located in Cedarvale, near Glen Cedar Rd. and
Warwick Ave., this project (Glen Cedar Park) estimated at $150 000 is at the
fundraising stage. Work is slated to begin in 2009. The plan is to upgrade a
park, i.e. acquisition of new playground equipment, resurfacing work and
development of a new walkway. ON
- TORONTO REDEVELOPMENT: Located in Toronto, at 2 and 4 Neville Park Blvd.,
this project is at the planning stage. A public meeting was held on June 10,
2008. The plan calls for the redevelopment of several lots. - Information: City of Toronto ON
- WELLAND NEW MIXED-USE BUILDINGS: Located in Welland, at 138 and 154 Riverside Dr.,
along the east shore of the Welland River, this project is at the planning
stage. A public meeting was held. Zoning and Official Plan amendments are
required. A report on the development, including recommendations by the city's
Planning Department, will go before city council in July 2008. The plan calls
for the construction of two five-storey apartment buildings and a parking area.
One building would contain 89 units and the other would contain 28 units.
Commercial businesses such as a convenience store and laundromat are planned
for the ground floor of each building. ON
- WOOLWICH TOWNSHIP NEW RETAIL CENTRE: Located in Woolwich, in the southeast end of the
Township, this project (St. Jacobs Power Centre) is slated to begin in June
2008. Development and site plan agreements have been reached. The plan calls
for the construction of a new 133 500-sqft Wal-Mart store. 719 parking spaces,
a 48-ft x 20-ft horse and buggy shelter and road improvements on King St. at
Hwy 85, including bridge widening and additional turning lanes, are also
planned. - Initiator: KING 86
DEVELOPMENT LTD PE
- ALBERTON NEW WIND FARM: Located in North Cape area, north of Nelligan Rd.
or Shore Rd., and Norway Rd. and Hogan Rd. on the south side, this project is
at the planning stage. An environmental study is underway. The plan calls for
the erection of 30 to 50 wind mills. The wind farm is expected to generate 100
MW of electricity. - Initiator: NEWEN QC
- CHELSEA CONSTRUCTION D'UNE ÉCOLE PRIVÉE DE MASSOTHÉRAPIE :
Situé
à Chelsea, sur le site du Nordik- Spa en Nature, ce projet (Centre Orchidée de
l'Outaouais) vient de débuter. Il sera accrédité par la Fédération Québécoise
des Massothérapeutes Agréés (FQM). Si tout va bien, les premiers étudiants
feront leur entrée dès septembre 2008. La nouvelle école de formation
professionnelle comportera 3 principaux volets. Le 1e sera réservé au public en
général, le 2e à la formation professionnelle, alors
que le 3e permettra aux massothérapeutes d'approfondir leurs connaissances
grâce à de la formation continue. -
Initiateur: CENTRE L'ORCHIDÉE DE L'OUTAOUAIS QC
- COATICOOK AGRANDISSEMENT D'UN CENTRE MÉDICAL:
Situé
à Coaticook, ce projet est évalué à 2 500 000 $. On vise à agrandir la place JR
Lefebvre, située au centre-ville, et y loger une clinique et une pharmacie dès
l'automne 2008. Le nouveau centre médical comptera 12 médecins. QC
- STE-PERPÉTUE CONSTRUCTION D'UNE RÉSIDENCE POUR AÎNÉS:
Situé
à Ste-Perpétue, ce projet est évalué à 4 000 000 $. Il a débuté en avril 2008
et l'ouverture est prévue en novembre 2008. L'édifice de 3 étages abritant la
Villa St-Charles comprendra 30 logements, soit des studios, des 2 ½, 3 ½ et 4 ½
pièces. Plusieurs services seront offerts tels salon Internet, salle de
conditionnement physique, restaurant, bureau médical comprenant une infirmière
et des préposé(e)s d'expérience. SK
- MOOSE JAW NEW HOTEL/RETAIL DEVELOPMENT:
Located
in Moose Jaw, on the zero block of River St., this project is slated to begin
in early 2009. The plan calls for the construction of a new hotel/retail
development at the site of the Royal Hotel, Brunswick Hotel, and Nevada
Nickels, which will be demolished. The project will feature shops along River
St. and a 74-100 room hotel, complete with a coffee shop and steakhouse. An
underground parking at the north end of the street is also planned. - Initiator: TODD MONTGOMERY May 2008 / Mai 2008AB
- EDSON BUILDING DEMOLITION: Located in Edson, at 414, 50 St., south of the post
office, this project is at the planning stage. Works concern a possible
building demolition. - Initiator:
MURPHY GROUP INC. AB
- MARWAYNE BRIDGE REPAIRS: Located in Marwayne, on Hwy 897 north of Marwayne,
this project (Lea Park bridge) was completed on April 28, 2008. Works concerned
bridge repairs, including the installation of a new rail. AB
- ST ALBERT NEW MIXED-USE BUILDING: Located in St. Albert, at 5 Perron St., this
project (Village on Perron) has been delayed due to a water main break. Subsoil
re-compacting and the pouring of new pilings are required. The plan calls for
the construction of a mixed-use building including three commercial bays on the
ground floor and 42 residential units on four upper levels. The new building
will be developed at the former site of Unique Fitness and Racquet. BC
- BURNABY NEW MIXED-USE BUILDINGS: Located in Burnaby, on Hastings St. east of Willingdon
Ave. in the Heights area, this project is at the
planning stage. City council approved rezoning changes to allow a mix of shops
and condominiums. However, each project will require a separate rezoning. The
plan is to build 4-storey mixed-use buildings along Hastings St. - Information: CITY OF BURNABY BC
- PROVINCE OF BRITISH COLUMBIA NEW POWER LINE: Located in British Columbia, this project
(Northwest Power Line) estimated at $400 000 000 is on hold. The Initiator is
seeking $158 000 000 in funding from investors. A feasibility study is planned.
The plan calls for the development of a new power line involving the
electrification of Hwy 37. - Initiator:
NORTHWEST POWER LINE COALITION BC
- SUMMERLAND NEW DEVELOPMENT: Located in Summerland District, at the north
entrance of the district, this project is at the land acquisition stage. Future
development may occur. The 80-ha property includes land between Hwy. 97 and
Garnett Valley Rd. and between Bentley Rd. to the south and a large parcel of
crown land to the north. - Initiator:
MURPHY BROTHERS GROUP BC
- VANCOUVER NEW TOWNHOMES: Located in Shaughnessy, this project is at the
planning stage. City council recently approved the rezoning application. Public
hearings were held. A development permit is required. The plan calls for the
construction of 11 townhouses near Granville and 16th. The construction of
larger townhouses higher on the property, closer to Nichol House, is also
planned. - Initiator: BELL HOLDINGS MB
- FLIN FLON PARK IMPROVEMENTS : Located in Flin Flon, this project (Rotary Park)
may receive $15 000 from the City. The scope of the work includes turning the
wading pool into a spray pad and opening up more green space. - Initiator: ROTARY CLUB MB
- GIMLI NEW CAMP: Located in Rembrandt, one mile east of Hwy. 7 on
Zolinski Rd., just east of the railway tracks, this project (Camp Kan-Do) is
estimated at $12 000 000. Municipal council recently approved roadwork and
additional drainage infrastructure. Work is slated to begin shortly. An open
house was held on April 19, 2008. Rezoning is required. The plan calls for the
construction of a new 120-acre camp for people with disabilities, including a
five-acre lake, baseball diamonds, six private enclaves of cabins, a
self-sustaining garden, a 10-acre petting zoo, a 10-acre riding stable and
compound, a 400-seat amphitheatre and a 40 000-sqft Central Great Hall complete
with dining facilities, gym, indoor pool, library, computer lab and a central
fireplace. The new camp would house 200 campers. Work on Zolinski Rd. from Hwy
7 E. and Church Rd. to the east of the property and the installation of two
through-grade culverts on Church Rd. and two additional access driveways from
the main entrance, on the east side of the property along the west side of
Church Rd., are also planned. -
Initiator: TRENNA ROSS MB
- ST CLAUDE NEW WELLNESS CENTRE: Located in St. Claude, this project
(St.Claude-Haywood Wellness Centre) estimated at $1 700 000 is at the
fundraising stage. Plans for the project were made public in April 2008. The
plan is to construct a 7 455-sqft facility that will be added onto an existing
hospital and personal care home. NS
- YARMOUTH OFFICE BUILDING EXPANSION: Located in Yarmouth M.D., Initiator’s site, this
project is estimated between $100 000 to $150 000. The plan calls for the
construction of an employee gym facility.
- Initiator: REGISTER.COM ON
- EXETER PARK REVITALIZATION: Located in Exeter, on Huron St. W., this project
(Victoria Park) estimated at $100 000 is at the planning stage. Fundraising is
underway. The plan calls for the revitalization of a park, including new
walkways, new lighting, additional benches and additional child play
areas. - Initiator: EXETER LIONESS CLUB ON
- FORT FRANCES CHURCH ADDITION: Located in Fort Frances, in the Nelson St. area,
this project (St. Mary's Church) is underway. The plan calls for the
construction of an addition to a church.
- Initiator: ST. MARY’S CHURCH ON
- GRAND BEND NEW CONDOMINIUM BUILDING: Located in Grand Bend, 24 Government Rd., at the
former Sanders Tavern, this project is at the planning stage. The Initiator is
seeking approval of amendments to the Lambton Shores Official Plan. The plan
calls for the construction of a six-unit condominium building. - Initiator: ART BLUMAS ON
- GRAND BEND NEW RETIREMENT HOME: Located in Grand Bend, on Hwy 21, across from
Sobeys, Shoppers Drug Mart and the Grand Bend CHC, this project is at the
planning stage. Site plan approval and rezoning are required. The plan calls
for the construction of a 120- to 160-unit luxury senior retirement home. - Initiator: TRU LAND DEVELOPMENTS INC. ON
- LONDON BUSINESS/COMMUNITY HALL EXPANSION: Reference # 2008-D11-06 (City) Located in London, at 1003 Hamilton Rd. and
985-1005 Hamilton Rd., this project is on hold pending rezoning approval. A
public meeting was held to discuss the application. The plan calls for a
business/concert hall expansion. -
Initiator: 1618055 ONTARIO INC. ON
- LONDON NEW DEVELOPMENT: Located in London, at 2280 Wickerson Rd., this
project is at the preliminary stage. A 1-year extension has been approved. The
plan calls for new development. -
Initiator: 947131 ONTARIO INC. (SLAVKO PRTENJACA) ON
- LONDON PARKING LOT EXPANSION / BUILDING DEMOLITION: Reference # 2008-D11-02 (City) Located in London, at 78-80 Oxford St. W.,
this project is hold, pending rezoning approval. A public meeting was held to
discuss the application. The plan calls for the demolition of a heritage
building in order to expand the parking for the Pellark Medical Building
located at 240 Wharncliffe Rd. N. Among other reasons, rezoning could be
refused because the building is classified as a Priority 2 heritage building. - Initiator: JAMIE DEAKIN ON
- LUCKNOW BARN RECONSTRUCTION: Located in Lucknow, at 358 Hayes Lake Ave., near
Kinlough, this project estimated at $150 000 is at the preliminary stage. The
plan calls for the reconstruction of a barn that was recently destroyed by
fire. A house was also damaged by the fire.
- Initiator: GLEN & SHELLEY HALDENBY ON
- MARKHAM COMMERCIAL BUILDING IMPROVEMENTS: Reference # SC 08 10787 (City)
Located in Markham, at 50 Bur Oak, northeast corner of Bur Oak &
Kennedy Rd., this project is on hold pending municipal approval. The plan calls
for construction of an outdoor play area, as well as the relocation of the
storefront to accommodate the play area. The relocation of 2 parking spaces in
existing landscaped area, and new windows in the south and east elevations are
also planned. - Initiator: TRI-LAG CORP
LTD ON
- MARKHAM NEW CATHEDRAL:
Reference # SC 08 110712 (City) Located
in Markham, at 455 Ferrier St., north of Steeles Ave. E., west of Warden Ave.,
this project is on hold pending municipal approval. Based on a surface of 7077
m2, works concern the construction of a new three-storey, 1 800-seat cathedral
with 375 parking spaces on a 4.88-ha site. - Initiator: ST. MARK'S COPTIC CANADIAN
VILLAGE ON
- MARKHAM NEW COMMERCIAL PLAZA:
Reference # SC 08 108962(City) Located
in Markham, at 9900, 48 Hwy., southwest corner of Major Mackenzie Dr. &
Markham Rd., this project is on hold pending municipal approval. Based on a
surface of 16 911 m2, spread on 14 structures, works concern the construction
of a commercial plaza with 933 parking spaces.
- Initiator: CRET 9900 MARKHAM LTD ON
- MARKHAM NEW CONDOMINIUM UNITS:
Reference # CU 08 109760 (City) Located
in Markham, at 4404, 16th Ave., north of 16th Ave., west of Kennedy Rd., this
project is on hold pending municipal approval. The plan calls for the
construction of new condominium units. -
Initiator: KYLEMORE (POST ROAD) LTD ON
- MARKHAM NEW DEVELOPMENT:
Reference # SU 07 128278 (City)
Reference # ZA 07 128288 (City)
Located in Markham, at 11160 Woodbine Ave., west side of Woodbine Ave.,
north of Elgin Mills Rd., this project is on hold pending municipal approvals,
i.e. Draft Plan of Subdivision and Zoning By-Law Amendment. A public meeting
will be held to discuss the applications. The plan calls for the development of
52 acres of land. - Initiator: 11160
WOODBINE AVE LTD ON
- MARKHAM NEW GARAGE:
Reference # SC 08 109877 (City) Located
in Markham, at 14 Alexander Hunter Place, north of 16th Ave., this project is
on hold pending municipal approval. The plan calls for the construction of a
new 58-m2 detached garage. - Initiator:
TARA COOKE & GREG KNIGHT ON
- MARKHAM NEW HOUSE:
Reference # SC 08 109447 (City) Located
in Markham, at 11 Buttonville Cres. E., east of Woodbine, north of Hwy. 7, this
project is on hold pending municipal approval. The plan calls for construction
of a new single family residential house.
- Initiator: SHIN-LI & SOO-LING NG ON
- MARKHAM NEW RESIDENTIAL BUILDINGS:
Reference # OP 08 109228 (City) Located
in Markham, at 8293 Warden Ave., east side of Warden Ave., south of Hwy. 7,
this project is on hold pending municipal approval. The plan calls for the
construction of two 20-storey and one 8-storey residential buildings. - Initiator: ARYEH CONSTRUCTION LTD ON
- MARKHAM NEW RESIDENTIAL DEVELOPMENT: Reference # ZA 08 110187 (City) Reference # SU 08 110200
(City) Located in Markham, at 7085, 14th
Ave., south side of 14th Ave., between the Donald Cousens and the CP Railway
Track, this project is on hold pending the approval of a draft plan of
subdivision. A public meeting will be held to discuss the application. The plan
calls for the construction of 58 townhouse units and two single detached lots. - Initiator: ATTILIO VETTESE ON
- MARKHAM NEW RESIDENTIAL UNITS:
Reference # SC 08 107876 (City) Located
in Markham, at 15 Deer Park Lane, east of Main St. Markham N., south of 16th
Ave., this project is on hold pending municipal approval. The plan calls for
the construction of four semi-detached residential units. - Initiator: MICHAEL JACOBS ON
- MARKHAM NEW RESIDENTIAL UNITS:
Reference # ZA 05 013080 (City) Reference # SU 05 013073 (City) Located in Markham, at 78 and 90 Lee Ave.,
this project is on hold pending municipal approvals, i.e. Zoning By-law
Amendment and draft Plan of Subdivision. A public meeting was held on April 8,
2008 to discuss the applications. The plan is to create 10 lots for single
family detached dwellings. - Initiator:
1606090 ONTARIO LTD ON
- MARKHAM NEW SPORTS CENTRE: Located in Markham, this project (Canadian Sports
Institute of Ontario (CSIO)) is at the preliminary stage. The plan calls for
the construction of a new sports centre.
- Initiator: CANADIAN SPORTS INSTITUTE OF ONTARIO (CSIO) ON
- MARKHAM TOWNHOUSE DEVELOPMENT:
Reference # ZA 08 107108 (City) Reference # CU 08 107106 (City) Located in Markham, at the southwest corner
of Major Mackenzie Dr. & McCowan Rd., this project is on hold pending
municipal approvals, i.e. Zoning By-law Amendment and Draft Plan of
Condominium. Town staff recommended in a report that a public meeting be held
to discuss the application. The plan calls for the construction of a 277-unit
townhouse development. - Initiator:
LASSETER DEVELOPMENT INC. ON
- MARKHAM TWO MIXED-USE BUILDINGS:
Reference # SC 06 129809 (City) Located
in Markham, at the northwest corner of Hwy. No. 48 & Edward Jeffreys Ave.,
this project (Phase 1 – Governor's Square) is on hold pending site plan
approval. Town staff recommended in a report dated May 20, 2008 that the
application be endorsed in principle, with conditions. The plan calls for the
construction of two mixed-use buildings consisting of 260 apartment units and
commercial/retail space at grade. - Initiator:
ANAGNI HOMES LTD ON
- MISSISSAUGA NEW RESIDENTIAL BUILDING: Located in Mississauga, north of Enterprise Blvd.
& east of Rouge Valley Dr., this project is on hold pending municipal
approval, i.e. Zoning By-law Amendment. The plan calls for the construction of
a new 14-storey residential building. -
Initiator: RULAND PROPERTIES INC. ON
- MISSISSAUGA OPEN WATERCOURSE RECONSTRUCTION: Reference # GC-0332-2008 (City) Reference # PO.12.Sun (Ward 2)
(City) Located in Mississauga, at the
rear of 832 Sunningdale Bend, this project (Sheridan Creek) has been approved
by city council. The plan is to reconstruct, channelize, improve, maintain and
manage a portion of an open watercourse.
- Initiator: BARRY HALMAN & JACQUELINE JOINER ON
- MOUNT FOREST NEW MANUFACTURING FACILITY:
Located
in Mount Forest, on Industrial Dr., this project is underway. The multi-phase
plan calls for the construction of a 10 800-sqft manufacturing facility on 9.5
acres. Approx. 20 to 25 people will be hired. The plant will be expanded in the
future. It will eventually contain 50 000 sqft of space. The project will
generate 110 new jobs over the next couple of years. - Initiator: TECHNO STEEL CANADA ON
- TORONTO NEW RESIDENTIAL DEVELOPMENT:
Located
in Toronto, this project is on hold. Requests to redesignate lands as well as
zoning amendments were rejected by North York Community Council on April 8,
2008. The plan calls for the construction of a 25-storey condominium building
in the Yonge St. and Eglinton Ave. area. Residential
development on lands bounded by Roselawn Ave., Duplex Ave., Helendale Ave. and fronting Yonge St. between Roselawn and Helendale is
also planned. - Initiator: TREE
DEVELOPMENTS INC. QC
- BROSSARD AMÉNAGEMENT D'UN CENTRE D'ENTRAÎNEMENT:
Situé
à Brossard, dans le complexe d'entraînement du Canadien dans le quartier DIX30,
ce projet (centre Mansfield Rive-Sud) se réalisera prochainement. Le centre
ouvrira ses portes en novembre 2008. Après l'inauguration de Mansfield
Rive-Sud, on examine la possibilité d'ouvrir 2 autres centres dans la région
montréalaise. - Initiateur: CENTRE
MANSFIELD RIVE-SUD QC
- GATINEAU CONSTRUCTION D'IMMEUBLES FÉDÉRAUX:
Situé
à Gatineau, ce projet vient de faire l'objet d'un appel d'offres. On vise la construction
de 2 édifices à bureaux. L'un des édifices, d'une superficie de 40 000 m2, sera
situé sur un terrain encore à déterminer, dans le quartier des affaires du
Vieux-Hull. Le 2e édifice (455 boulevard de la Carrière) aura une superficie de
35 000 m2. Ces édifices, évalués à plus de 30 000 000 $ à 35 000 000 $ chacun,
ouvriront en 2011 et permettront d'accueillir quelque 6 200 fonctionnaires. QC
- MONTRÉAL (ROSEMONT / PETITE-PATRIE) CONSTRUCTION DE BÂTIMENTS:
Référence # CA08 26 0023 (ville) Situé à
Rosemont / Petite-Patrie, aux 6252, 6264 et 6274 rue St-André, ce projet a été
approuvé par la ville. On vise la construction de 3 bâtiments de 3 étages avec
constructions hors-toit. - Architecte:
Jean-Lou Hamelin, architecte QC
- SAINT-HENRI-DE-MASCOUCHE TRAITEMENT DES SOLS CONTAMINÉS:
Situé
à Mascouche, paroisse de Saint-Henri-de-Mascouche, ce projet est en attente
d'autorisations au ministère de l'environnement. Les travaux visent le
traitement des sols contaminés. (pour votre
information seulement). Note: Nous tenons à vous informer de cette demande
faite au ministère, mais nous n'avons pas vérifié ce projet auprès de
l'initiateur. - Initiateur: ÉCOLOSOL
INC. QC
- TASCHEREAU INSTALLATION D'UN ATELIER DE PEINTURE OU DE REVÊTEMENT: Situé à Taschereau, ce projet est en attente
d'autorisations au ministère de l'environnement. Les travaux visent
l'installation d'un atelier de peinture ou de revêtement. (pour
votre information seulement). Note: Nous tenons à vous informer de cette
demande faite au ministère, mais nous n'avons pas vérifié ce projet auprès de
l'initiateur. - Initiateur: JOËL LEDUC SK
- DAFOE TRAVEL CENTRE EXPANSION: Located in Dafoe, this project (24 Seven Travel
Centre) is underway. The plan calls for the expansion of a travel centre. - Initiator: 24 SEVEN TRAVEL CENTRE SK
- MAPLE CREEK BUILDING ADDITION: Located in Maple Creek, at 33 Pacific Ave., this
project has been approved by town council. The plan calls for the construction
of an addition onto the front of a property.
- Initiator: GENE LEE SK
- MOOSE JAW NEW RESIDENTIAL DEVELOPMENT:
Located
in Moose Jaw, this project is at the land acquisition stage. The plan calls for
the construction of 20 single-dwelling residential units on the former Providence
Hospital property. - Initiator: Ron
Thul, Developer SK
- NIPAWIN OFFICE BUILDING REPAIRS: Located in Nipawin, this project (The Nipawin
Journal) has not been confirmed yet. The plan is to repair a building that was
damaged by a massive natural gas explosion and fire in April 2008. - Information: Town of Nipawin |
||||
|